The Brewery – Block 4 Parking Structure in Milwaukee recently received LEED Gold Certification from the U.S. Green Building Council.
----- Advertising -----
Eppstein Uhen Architects served as the design architect and LEED administrator for the 282,055-sq-ft parking facility that includes 880 parking spaces and 8,400 sq ft of office/retail space. The project was managed by Zilber Ltd.
Located at 9th Street and Juneau Avenue, the building replaces some of the original Pabst Brewery buildings that had deteriorated and could not be reused.
The parking structure was designed to maintain the original massing as well as complement the aesthetic of the surrounding historic buildings.

Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.